This building is a 2-story barndominium with 2 bathrooms on one end. The other end is a mechanic shop for equipment. It boasts a 20′ x 60′ overhang with an 8″ concrete base for working on equipment. The open end is a wash bay for the equipment.
-
Metal barndominium with attached mechanic shop and wash bay.
-
We always start with the concrete pour!
-
Metal material delivery.
-
Starting the framing.
-
Metal Framing for the barndominium half.
-
Walls and insulation going up.
-
More metal walls and insulation.
-
View of the back wall from the front.
-
Front walls going up.
-
Barndominium half is almost finished.
-
A look at the insulation.
-
Metal roof is on.
-
Almost ready to put the overhang on the front of the building.
-
Framing for the metal overhang on the front of the building.
-
Almost ready for the metal roof on the overhang.
-
Ready for the wash bay roof.
-
Wash bay roof framing.
-
Wash bay roofing going on.
-
Overhang roofing going on.
-
Red trim to keep the roof weather tight.
-
Putting the finishing touches on the barndominium and overhang.
-
The red trim and one of the ventilators.
-
The metal wash bay is finished and so is the overhang!